Nevada Prevailing Wage on Public Works Under NRS 338

A public-works paving operation: a dump truck feeding an asphalt paver with a worker in an orange hi-vis vest, North American truck and equi

Nevada pays a different rate for government construction than for private construction. The prevailing wage on public works is a floor set by law. It applies to each craft in each region of the state. A drywall hanger on a Clark County School District campus earns one rate. The same worker on a private strip mall can earn very different money for identical hours. Chapter 338 of the Nevada Revised Statutes sets that rule, and it also tells you where the rate should appear.

Workers usually find out something went wrong months later. A coworker mentions a number. A union rep asks a question. A certified payroll shows a classification nobody recognizes. By then several paychecks have already cleared, and the job may have moved on to another phase.

What Counts as a Public Work

NRS 338.010 defines the terms that decide everything else. A contract means a written contract between a contractor and a public body. It covers labor, materials, equipment or supplies for a public work. A contractor means a person licensed under chapter 624, or a design build team. Day labor covers cases where a public body hires, supervises and pays workers directly. No written contract sits behind that arrangement.

In Southern Nevada that definition sweeps in a lot of work. Terminal and apron projects at Harry Reid International Airport qualify. School district campuses, county buildings, fire stations, water reclamation facilities and university projects qualify. Highway work for the Nevada Department of Transportation on Interstate 15 or US 95 qualifies. The State Public Works Division manages many state projects. You can see its role at the Nevada State Public Works Division site.

Private developers sometimes build on land tied to a public agency. Those hybrid deals get argued case by case. The label on the sign out front settles nothing.

What NRS 338.020 Requires

The statute is specific. Every contract to which a public body of this State is a party must state the wage rates in express terms. That applies to any contract requiring skilled or unskilled labor on a public work. The contract has to give the hourly and daily rate for each class of worker. That rate must not fall below the rate prevailing in the region. It also has to appear on the site of the public work, in a place generally visible to workers.

Go look for that posting. A jobsite trailer with no wage sheet on the wall tells you something about the contractor’s habits. Where public work happens by day labor, the statute says the prevailing wage for each class applies. The contractor must state that rate clearly to those workers at hiring.

Overtime under the same section

NRS 338.020 also sets overtime. A contractor must pay at least one and one half times the applicable prevailing rate. That premium covers hours over forty in a scheduled work week. The same premium applies for hours over eight in a workday. A scheduled four day week of ten hour days by mutual agreement changes that daily trigger. Workers covered by a qualifying collective bargaining agreement follow the terms of that agreement instead.

How the Rate Gets Set

NRS 338.030 puts the Labor Commissioner in charge of the number. The public body awarding the contract must ascertain the prevailing wage from the Labor Commissioner. That happens for each craft or type of work in the region. The Labor Commissioner determines that wage by surveying contractors who performed work in the region, in each odd numbered year.

The statute builds in a challenge process. Within thirty days after a determination issues, an entitled party may object. That objection needs evidence that a different wage prevails. Any person may submit information supporting a change of fifty cents or more per hour for a craft in a region. The Labor Commissioner holds a hearing when in doubt or when an objection arrives, with newspaper notice in the region beforehand.

Two practical points follow. The rate depends on your craft classification, not on your job title. It also depends on the region where the work sits, so a Las Vegas rate and a rural rate can differ. So the prevailing wage on public works changes with both craft and geography.

The Ways Contractors Come Up Short

Straightforward underpayment is the rarest version. The common problems hide inside the paperwork.

  • Misclassification, where a journeyman gets paid as an apprentice or a laborer rate covers skilled work.
  • Apprentice ratios ignored, so untrained workers fill slots that the rate schedule never contemplated.
  • Hours shifted onto a private job, which strips the public rate from work actually done on the public site.
  • Travel, loading and cleanup time recorded as unpaid.
  • Fringe benefit credits claimed for plans that never received a contribution.
  • Certified payroll that lists a different worker, a different classification or fewer hours than the sign in sheet shows.

Documents beat memory in every one of these disputes. Keep your own daily record of hours, location, foreman and the work you performed. Photograph the posted wage sheet. Save text messages about start times. A worker with a notebook wins arguments that a worker with a recollection loses.

Fringe Benefits and the Cash Question

NRS 338.010 defines a bona fide fringe benefit as a contribution made at least monthly to an independent third party under a fund, plan or program. That plan has to exist for the sole and exclusive benefit of the worker and the worker’s family and dependents. None of the assets may revert back to the contributing employer or the plan sponsor.

That definition closes a familiar loophole. A contractor cannot promise a benefit, keep the money, and count it against the rate. When benefit contributions stop, the cash portion of the wage generally has to rise to cover the gap.

What the Public Body Has To Do

NRS 338.070 gives the awarding public body real duties. It must investigate possible violations committed during the contract and inform the Labor Commissioner of any it finds. It must also withhold and retain sums forfeited under these sections when paying the contractor. No sum may be withheld or forfeited except from the final payment without a full investigation by the awarding body.

NRS 338.060 supplies the penalty. In the statute’s own words, a contractor engaged on a public work forfeits, as a penalty to the public body, not less than twenty dollars nor more than fifty dollars for each calendar day or portion of a day that each worker is paid less than the designated rate. A general contractor may withhold from a subcontractor enough to cover penalties charged for that subcontractor’s failures.

Notice who receives the penalty. It goes to the public body rather than to you. The back wages are a separate question, which is why workers file their own claims instead of waiting for an agency outcome.

The Labor Commissioner Route

The Office of the Labor Commissioner takes wage claims from Nevada workers. NRS 607.205 gives the Labor Commissioner power to conduct hearings and issue decisions in aid of enforcing the state labor laws. That process costs nothing to start and does not require a lawyer.

It is not always the better path. An administrative claim moves at its own speed and has limits on what it can order. A civil action offers discovery, which is how certified payrolls, sign in sheets and daily reports actually come out of a contractor’s file cabinet. Our comparison of a Labor Commissioner wage claim against suing your employer lays out how to choose. Broader strategy sits in our guide to navigating wage and hour disputes.

Retaliation and Group Claims

Fear stops most of these claims before they start. A worker who raises a rate question expects to lose hours, lose the next call, or lose the job outright. Nevada and federal law both address retaliation for asserting wage rights, and the timing of an adverse action often proves the point better than any statement does.

Crews rarely have a problem alone. When one classification is wrong, it is usually wrong for everybody on that crew for the whole phase. Several workers with matching records make a far stronger case than one worker with a good memory.

Deadlines

NRS 11.190(3)(a) allows three years for an action upon a liability created by statute, other than a penalty or forfeiture. NRS 11.190(4)(b) sets two years for an action upon a statute for a penalty or forfeiture. Which one applies depends on what the claim actually seeks, so the framing of the complaint carries weight here.

Move earlier than any of those dates. Certified payroll records, sign in sheets and daily reports live with contractors who change hands, close, and let storage lapse. A claim brought while the job is still active reaches evidence that a claim brought two years later never sees.

When the Same Job Also Hurts You

Public jobsites injure people, and the wage question and the injury question run on different tracks. One point of overlap matters a great deal. NRS 41.035 limits an award for damages in a tort action against the State, a political subdivision, an immune contractor or a public officer acting within public duties. That section also bars exemplary or punitive damages in those actions.

The private companies on the same site carry no such limit. A general contractor, a subcontractor, an equipment supplier or a crane operator answers under ordinary Nevada tort rules. So a worker with a spinal injury from a trench collapse or a falling load usually builds the real recovery against the private parties. Our catastrophic injury practice page explains how those third party claims work alongside a workers compensation file, and our piece on road work zone worker injury claims in Nevada covers the highway version of the same problem.

Checking Your Own Pay Stub This Week

The prevailing wage on public works is not a bonus, and it is not a favor. You do not need a lawyer to start. Pull your last four stubs and compare the hourly rate against the classification you actually worked. Ask the office for the wage determination that applies to your project and to your craft. Look for the posted rate sheet on the site. If the numbers do not line up, the Bourassa Law Group will look at the paperwork with you at no charge through our contact page.

This article provides general information about Nevada law and is not legal advice. Reading it creates no attorney client relationship. Public money built that project, and the rate attached to it belongs to the people who did the work.

Related Posts

Free Case Evaluation

The evaluation is FREE! You do not have to pay anything to have an attorney evaluate your case.